This is the room with the most choices in it, which makes it the room where the budget quietly grows. Not through dishonesty, usually. Through eleven small yeses. Here is exactly where they happen, so you can see them coming.
Priced by written scope, never by the hour.
It is never one big decision. It is a sequence of small ones, each reasonable on its own, each taken while the room is already open and saying no feels wasteful. These are the eleven yeses, in the order they usually arrive.
New wiring, a niche, blocking for a bench, a bigger mirror. Genuinely cheaper now than later, which is exactly why it is the easiest yes to give and the easiest to give four times.
The most predictable one. New wall tile makes the existing floor look tired, and the floor was not in the scope. Decide it before, not standing there.
Six more inches of shower is a wall move, new framing, more tile and often the drain. It never costs what six inches sounds like it should.
A double vanity is two of everything: two faucets, two drains, more counter, more electrical portions performed by the licensed trade.
Outside the bathroom door and therefore outside the scope, unless it is written in. Worth deciding on purpose rather than at the end.
A master bathroom is several jobs sharing a floor. Each one moves independently, which is why the total is so sensitive to small changes.
Keeping every fixture where it is turns a large job into a manageable one. Moving the shower or the toilet is plumbing work by the licensed trade and it is the single biggest lever.
A bench and a niche need blocking and waterproofing planned before the wall closes. Decided late, they are a rebuild.
Three different budgets and three different resale conversations. Worth settling first, because it changes the whole layout.
A written scope is only worth something if it says where it stops. These are the boundaries we put in writing before anyone starts.
A master bathroom has more stages and some of them cannot overlap. Waterproofing cures before tile, grout cures before use, and the licensed trades come in sequence rather than all at once. The written scope carries the dates and the milestones.
Every company on your list will say yes to this job. Here is where we say no, and why. It costs us the odd project and it saves you a great deal more than that.
At some point the eleven yeses have taken the job past what you meant to spend. We will say so and show you where the line is, rather than let it arrive as an invoice.
In a house with one bathtub, taking it out of the master to gain shower space is a resale decision, not just a design one. Worth deciding on purpose.
Starting demolition with the tile undecided is how a fixed price stops being fixed. We would rather wait a week for selections than reprice the job in the middle.
If the work we did fails, we come back and fix it, for as long as you own the home. Not one year. Not five. As long as you live there.
A warranty is only worth what its exclusions say. Ours are above, in the same size type as the promise. Ask any other company you are talking to for theirs in writing, and check how long the tile is covered for.
By naming everything in the scope before it starts, and by pricing every change in writing before it happens rather than adding it up at the end. The discipline is not glamorous but it is the entire difference between a fixed price and an estimate.
If it is the only tub in the house, usually yes for resale. If there is another tub elsewhere and nobody uses this one, giving that space to the shower is almost always the better room.
Normally yes, as long as there is another bathroom. The room itself is out of use for the whole job, and the noisy stages are named in the plan so you can work around them.
You choose, and we tell you what each choice does to the labour and the schedule before you commit. Large format on an uneven wall and a herringbone layout both cost more to set, and you should know that while you can still change your mind.
If anyone shaves their legs, has a mobility concern, or is likely to in the next ten years, yes. It needs blocking behind the wall, so it is a cheap decision now and an expensive one later.
Hillsborough, Pinellas, Pasco, Manatee and Sarasota counties. If your town is not on this list, call and ask: the answer is often yes.
Never hourly, never a verbal figure, and our workmanship carries a lifetime warranty. Hillsborough, Pinellas, Pasco, Manatee and Sarasota counties.