Exterior & Front of House · Tampa Bay

Exterior remodel cost in Tampa Bay.

The Tampa market averages are on this page, with their source. They are not our quote. An exterior remodel cost without a walkthrough is a guess, and a guess is what moves later. What we can give you is better. The 3 questions that put any front job in a range, and what a low bid is quietly cutting.

The front of a white house with a porch and a lawn, exterior remodel cost
Two quotes for the same front can be half of each other. The difference is the wood nobody looked at.

What a low exterior remodel cost is actually cutting.

Two quotes for the same front come in far apart. The cheap one is not magic. It skipped the wood under the paint, and you find out next rainy season. Here is what to look for in any quote, including ours.

A weathered wooden house wall with peeling paint, exterior remodel cost
01

The rot under the paint

Fascia, window trim and the bottom of siding rot from the back, where you cannot see it. A low bid paints over it. A real one probes every board with an awl and prices the bad ones. Paint on rotten wood peels in a year.

02

The permit for the door

In Florida a replacement exterior door needs a product approval number and, in most cities, a permit and an inspection. A low bid may skip both. If the door fails in a storm, your insurer asks for the paperwork.

03

The flashing you never see

Behind siding and above windows, thin metal or tape sends water out instead of in. A low bid replaces the board and leaves the old flashing. The leak comes back behind the new board.

04

Prep, protection and cleanup

Washing, scraping, priming bare wood, covering the plants and the windows, and cleaning up every day. These are hours. A low bid either skipped them or will bill them later.

The 3 questions that put you in a range.

The Tampa averages above are a starting point, not a promise. But 3 questions decide where any exterior job lands. You can answer them before you call.

01

How much wood is bad?

Walk the front and press the bottom of every board with a screwdriver. Soft means rot. One board is a repair. A whole run of fascia or a wall of siding is a bigger job. This question moves the number more than any color choice.

02

Door, siding, soffit, or all of it?

One trade at a time is the smallest job. The whole front as one scope costs more and saves the setup, the scaffolding and the second paint job. Each piece you add moves the number and the calendar.

03

Paint, or wood and paint?

Paint alone on sound wood is the base case. Paint after repairs is the middle. New siding, new door and paint is the top. The prep decides how long the paint lasts, and the prep is most of the price.

04

The fourth question, which is ours

Where is the water coming from. A gutter that overflows, a roof edge with no drip edge, a sprinkler hitting the wall. We find it before we write anything. That is why our number comes after the walkthrough.

What Tampa homeowners pay for exterior work, on average.

These are market averages for Tampa, from Angi, updated August 2026. They are not our quote. They show where most exterior jobs land before anyone has seen your house.

01

Exterior door replacement in Tampa

$489 to $2,843 for most doors, and $1,598 on average, by Angi's Tampa data. A single door runs $235 to $3,670 installed. Impact rated and double doors sit at the top.

02

Siding repair in Tampa

$577 to $2,026 for most repairs, and $1,273 on average. Rot and water damage cost more per foot than a cracked board.

03

Siding replacement in Tampa

$4,029 to $11,022 for most houses, and $7,292 on average. Fiber cement costs more per foot than vinyl and holds up better in the Florida sun.

A whole front with new siding, door and soffit lands above these ranges. One door in a sound frame lands below. The 3 questions below tell you which way yours leans. Your written number comes after the walkthrough.

Sources: Angi, exterior door cost in Tampa, FL, updated August 7, 2026. Angi, siding repair cost in Tampa, FL, updated July 9, 2026. Angi, siding replacement cost in Tampa, FL, updated July 8, 2026. Market figures, not a Maplex quote.

What happens before the first ladder goes up.

The price is written before the work starts. These are the things that get settled first, because they are what make the number hold.

A ladder leaning against the wall of a house before work starts, exterior remodel cost
01

A walkthrough of the real front

We probe the wood, look under the eaves, open the door and check the frame. We look at the gutters and where the sprinklers hit. It takes about an hour. Everything in the scope comes from that hour, not from a photo.

02

A written scope, line by line

Every part of the job is listed. What is in, what is not, and which permit each part needs. The not in list is the honest part. It is what keeps the price from moving later.

03

One closed price

One number for the written scope. It does not move unless you change the scope. If you add the walkway, the change is priced in writing before it happens. That is the whole method.

04

Milestones tied to stages you can see

Payments are tied to stages. Signing, rot repaired and inspected, door in and inspected, paint on, final walkthrough. You pay for what you can see. Nobody pays for a promise.

05

The order of the trades

Wood before paint. Door before trim. Gutters before the walkway. The scope lists the order, because doing it backwards means doing it twice.

What is included, and where it ends.

Every exterior scope on this site says where it stops. These are the boundaries we put in writing before anyone starts.

Included in the scope
·A walkthrough and a written scope before any number
·Every board probed and the bad ones listed
·Rot repaired with the flashing behind it
·The door permit and product approval named, and who pulls it
·Prep, prime and paint on the parts the scope names
·Protection of plants, windows and the walkway
·Daily cleanup and a final walkthrough together
Named separately, never assumed
·Roof work. The drip edge and the shingles belong to a roofer, named when they are needed.
·Gutters, unless the scope names them.
·Windows. A window replacement is its own permit and its own scope.
·Permit fees, listed as their own line, at cost.
·Hidden rot behind a wall, priced only after it is visible, never guessed.

How long the front is a job site.

A door is a day once it arrives, and the arrival is set by the maker. Rot repair is days. Paint waits for the weather, and in Tampa that means mornings in the rainy season. The whole front as one scope runs weeks, most of it waiting on the door and the dry days. Your scope has the dates.

01
Walkthrough and written scope
02
Door ordered, lead time set by the maker
03
Permit filed for the door
04
Rot cut out, flashing set, new wood in
05
Door set and inspected
06
Wash, scrape, prime bare wood
07
Paint, in the dry window
08
Final walkthrough together

When we tell you not to do it

A front of house job is the one the neighbors see. That makes it easy to sell to someone who should fix something else first. Here is where we say no, and why.

The roof is leaking at the edge

New fascia under a roof that drips on it rots again in 2 years. The roofer comes first. We say so on the walkthrough, and we come back after.

The budget covers paint, not wood

If the number in your head is a paint quote and the wood is soft, it is half a job. Paint on rot peels. Wait, fix the wood, and paint once.

The house is going on the market next month

A full front remodel rarely returns its cost at sale. A pressure wash, a painted door and new house numbers often do. We would rather point you at the small job than sell you the big one.

You want it done before the rainy season, and it is June

Paint needs dry days and a door needs a permit. Promising both in 2 weeks in June is promising one of them badly. We schedule around the weather and say so up front.

An older wooden house with peeling paint and a boarded window, where rot gets found before paint goes on

Lifetime warranty on our workmanship.

If the work we did fails, we come back and fix it. That holds for as long as you own the home. On an exterior job it covers what we built and set. The wood we replaced, the flashing we put behind it, the door we hung, and the prep under our paint.

What the warranty covers
·New wood staying sound, with the flashing behind it doing its job.
·The door staying square in its frame and sealing at the weather strip.
·Paint we applied staying bonded, where we prepped bare wood and primed.
·Trim and caulk lines we set.
What it does not cover, said here and not in a footnote
·The products themselves. Doors, siding boards and paint carry their makers' warranties, and we hand you that paper.
·Rot in wood we did not replace, which was already old.
·Damage from a roof leak, a gutter overflow or a sprinkler after the job.
·Fading and chalking from the Florida sun over the years.
·Anything we were not allowed to open or repair, and what it does later.

A warranty is only worth what its exclusions say. Ours are above, in the same size type as the promise. Ask whoever you are talking to how long theirs runs, and get the number in writing.

Questions we actually get asked

Is an estimate the same as a quote?

Not always, and the difference costs money. An estimate is a guess and it can move. A quote is a price for named work. What we give you is a written scope with one closed price. Ask any exterior company which of the two you are holding.

Is the range on this page my price?

No. It is the Tampa market average from a public source, with its date. It tells you what most people paid. It cannot see your house. We give you a number after an hour at your house. It is a real one, and it holds.

Do you charge by the hour?

Never. Every exterior job is priced by written scope. An hourly price gives you no number to plan around, and nobody a reason to finish.

What makes the price go up after signing?

Only a change you ask for, or hidden rot we could not see. A change is priced in writing before it happens. Hidden rot is priced only after it is visible. Nothing else moves the number.

Can I do the front in stages?

Yes, and it is often smart. Rot and door this year, paint next year, walkway after. Each stage is its own scope. The one order that does not work is paint first. Paint on wood that is about to be replaced is money gone.

Is the walkthrough free?

Yes. It is how we get to a real number. It takes about an hour, and you get the written scope after it. There is no charge and no obligation.

The other exterior services

A white house wall with a dark front door, front door replacement Front door and entry door replacement A wind rated door with a number, a permit and an inspection. Close up of white lap siding on a house wall, siding repair Siding repair and replacement The board is easy. The flashing behind it is the job. Vented soffit panels under a roof edge with rain falling, soffit and fascia repair Soffit and fascia repair The rot is behind the gutter. The soffit is how the attic breathes. A one story house with a clean front and a paved walk, front of house remodel Front of house remodel Five small jobs, one order, one scope.

All five exterior services

Where we work

Hillsborough, Pinellas, Pasco, Manatee and Sarasota counties. If your town is not on this list, call and ask: the answer is often yes.

Tampa Brandon Riverview Valrico Seffner Ruskin Apollo Beach Plant City Temple Terrace Lutz St. Petersburg Clearwater Largo Seminole Palm Harbor Safety Harbor Oldsmar St. Pete Beach Wesley Chapel New Port Richey

A walkthrough, then a written scope with one closed price.

Never hourly, never a verbal figure, and our workmanship carries a lifetime warranty. Hillsborough, Pinellas, Pasco, Manatee and Sarasota counties.

See a sample scope document
{{ sentMsg }}