A front of house remodel is five small jobs done in the right order. Wood and water first. Then the door. Then paint. Then the walkway and the landing. Done out of order, you paint twice and the new door frames a rotten fascia. Done as one scope, the front gets finished once.
Priced by written scope, never by the hour.
Curb appeal pages show before and after photos. None of them shows the order the work happened in. That order decides whether it looks like that in 3 years. Here is what to ask before you hire anyone, including us.
Rot in the fascia, the siding and the door frame gets fixed before anything else. Paint over rot peels. A new door in a wet frame leaks. This step is the boring one and it is the one that protects everything after it.
The door needs a product approval and a permit. If the walkway touches the public sidewalk, so does that. Permits take time. They get filed early so the crew is never waiting on paper.
A new door and new trim change the lines a painter cuts to. Paint first and you paint again around the new door. Paint last, and the whole front gets one clean coat.
Walkway, landing, mulch and lights go in after the ladders are gone. Ladders and scaffolding wreck new pavers and plants. It sounds obvious. It gets done backwards every week.
Two fronts can look the same and price far apart. Here is what actually moves the number on a front of house remodel.
Door, siding, soffit and fascia, paint, walkway. Each one you add is its own material and its own days. The scope prices them as separate lines under one number. You can see what each one costs and drop one if you want.
The probing on the walkthrough finds it. A front with one soft fascia board is a repair. A front with rot at every window is a project. This is the line that moves most, and it is only known after the walkthrough.
A single fiberglass door with a factory finish is the base case. Sidelights, a transom, impact glass and wood all add. The door is often the single biggest line on the front.
Painting only the front can look like painting only the front. Some houses can take it, most cannot. The scope prices both so you decide with the numbers, not with a guess.
One scope with five trades in it only works if the order and the boundaries are written first. These are the things that get settled before the first ladder.
Fascia, siding bottoms, window trim, door frame and threshold. Soft spots get marked and photographed. You get the photos with the scope. Nothing on the front is a surprise later.
Rot, door, paint, ground. With dates. Each trade knows what has to be done before it arrives. That is what keeps the painter from painting a fascia that is about to come off.
The door permit is filed the week the scope is signed. So is the right of way permit for the walkway, if it is needed. The door is ordered the same week. The crew starts on the rot while the paper moves.
The door, the trim color and the body color get chosen before anything is ordered. Changing the door after the trim is painted is a change order and a second coat.
What stays gets covered. What goes gets removed first, not trampled. The new walkway is scheduled after the ladders, so it is never a work surface.
A written scope is only worth something if it says where it stops. These are the lines we put in writing before anything is ordered.
Weeks, not days, and most of it is waiting. The door takes the maker's lead time. Paint waits for dry days. The trades run in order, so nobody is on top of anyone else. The house is always closed and dry at night. Your scope has the dates.
A front remodel is the job the whole street sees. That makes it easy to sell to someone who should fix something else first. Here is where we say no, and why.
If the roof edge has no drip edge or the shingles are done, the front rots again under new paint. The roofer goes first. We say so, and we schedule after them.
A beautiful door in a rotten front is a beautiful door in a rotten front. If the number only covers the door, do the rot now and the door next year. The order still holds.
A full front remodel does not return its cost in 60 days. A wash, a painted door, new numbers and a clean walkway often do. We would rather point you at the small list.
Paint first means paint twice. If the door or the fascia is going to change, the paint waits. We will not put paint on a board that is coming off next month.
If the work we did fails, we come back and fix it. That holds for as long as you own the home. On a front remodel it covers what we built and set. The wood, the flashing, the door install, the prep under the paint, and the walkway base.
A warranty is only worth what its exclusions say. Ours are above, in the same size type as the promise. Ask whoever you are talking to how long theirs runs, and get the number in writing.
The five jobs the front usually needs. Rot repair on fascia, siding and trim. A new front door with its permit. Soffit and fascia, paint, and the walkway and landing. Each is a line in one scope. You can drop one. The order stays.
Because each job wrecks the one that came before it if it is done backwards. Paint before the door means painting twice. Walkway before the ladders means broken pavers. Door before the rot means a new door in a wet frame. Wood, door, paint, ground.
Either. The front is the most common ask because it is what the street sees. Painting only the front works on some houses and looks odd on others. The scope prices both so you decide with numbers.
For the door, yes, in most Tampa Bay cities, along with its Florida Product Approval number. For the walkway, only if it touches the public sidewalk. For paint and siding repair, usually not. The scope names each one and who applies.
Weeks. The door lead time and the dry days for paint set the calendar more than the labor does. Trades run one after another, in order. The scope has the dates and the house is closed and dry every night.
Yes. Rot and door this year, paint next year, walkway after. Each stage is its own scope. The one rule that does not bend is paint last. Paint on a board that is coming off is money gone.
Hillsborough, Pinellas, Pasco, Manatee and Sarasota counties. If your town is not on this list, call and ask: the answer is often yes.
Never hourly, never a verbal figure, and our workmanship carries a lifetime warranty. Hillsborough, Pinellas, Pasco, Manatee and Sarasota counties.