A master suite addition is a room addition with a bathroom inside it. That one sentence is most of the price. The bedroom is walls, a floor and a roof. The bathroom is a drain cut into a new slab and run to the sewer or the septic. A water heater that may not have the capacity. A wet room built to stay dry. Done right you get the best room in the house. Done wrong you get a bathroom that drains slow and a shower that never gets hot. The difference is decided in the slab.

A spacious bedroom with a king bed, two lamps and natural light, master suite addition
The bedroom is the easy half. The drain under the new slab is where the price lives.

The bathroom decides the job. Read this before you draw the bedroom.

Master suite pages show a bed and a view. None of them tells you this. The bathroom is what the plumber, the slab and the septic tank all care about. Here is what to settle before the bedroom gets drawn.

A bright bedroom with a walk-in closet in a minimalist design, master suite addition
01

Where the drain can run

A new bathroom needs a drain line under the new slab. It has to fall to the sewer or the septic tank. How far that is, and how deep, is the biggest line in the job. If the sewer is on the other side of the house, the line runs under the old slab too. The plumber prices it after seeing the yard.

02

Septic or sewer

On sewer the drain is a distance problem. On septic it is a capacity problem. A tank is sized for the bedrooms it serves. A new bedroom can mean a bigger tank or a new drain field. That is a County question, and we ask it before the drawing.

03

Hot water

A second full bath on one water heater means somebody showers cold. A bigger tank, a second heater or a tankless unit is a line in most suites. It belongs in the scope, not in a surprise the first winter morning.

04

The closet and the bedroom window

A walk-in closet is square feet with no plumbing, the cheapest part of the suite. The bedroom needs a window big enough to climb out of, at a set height. Both are drawn to the lot, and the lot sets the outside line.

The bathroom decides the price. The bedroom decides the rest.

Two suites the same size can price far apart. Here is what actually moves the number on a master suite addition.

01

The drain run and the septic

A short run to a sewer line at the back of the lot is the small line. A long run under the house, or a septic tank that has to grow, is the big one. Both are answered by the yard and the County before the price.

02

Tub, shower, or both

A shower alone is one drain and a pan. A tub adds a second drain and the weight of the water on the slab. A tub and a shower is the full bath, and the full price. Decide before the drawing, because moving a drain after the pour is the expensive way.

03

Everything a room addition already has

The slab, the walls, the roof tie-in, the dry-in, the power and the cooling. A suite is a room addition first, and the room addition page has those lines. The bathroom sits on top of them.

04

The finishes

Tile on the floor and the walls, a glass door, a vanity, fixtures. The bathroom is where the allowances live, and where two suites the same size separate. We write the allowances with numbers, so you know what is in before you shop.

What gets settled before the ground is broken.

The price is written before the work starts. These are the things that get settled first, because they are what make the number hold.

A close-up of architectural blueprints with a scale ruler, master suite addition
01

A walkthrough of the wall, the yard and the plumbing

We measure the wall the suite comes off and the roof it meets. We find the sewer line or the septic tank and the drain field. We look at the water heater and the panel. It takes an hour or two. Everything in the drawing comes from that.

02

The lot answer and the septic answer, in writing

Setbacks, lot coverage, easements and the HOA, by address. And on septic, the County's answer on the tank. Where the suite can stand and whether the tank can take it are settled before the price.

03

The flood map checked

Flood zone and base flood elevation for your lot. A raised slab changes the drain run too. And we check the job against the 50 percent rule, which a suite can cross on an older house.

04

A written scope, line by line

The plans, the site prep, the slab with the drains in it, the framing, the roof tie-in, the dry-in. The plumbing, the power, the cooling, the tile, the fixtures, the finish. Every trade named with its license. What is in, what is not.

05

One closed price, with milestones

One number for the written scope. Payments are tied to stages you can see. Signing, slab and underground plumbing inspected, dried in, rough work inspected, walls closed, tile done, final walkthrough. You pay for what exists in the yard.

What is included, and where it ends.

Every master suite scope on this site says where it stops. These are the boundaries we put in writing before anyone starts.

Included in the scope
·A walkthrough, the lot answer, the septic answer and the flood check before any number
·Plans, the engineer and the City review, by the contractor licensed for it and named in your scope
·Site prep, the slab with the drains under it, the walls and the roof, tied into the house. By the contractors licensed for each, named in your scope
·Roofing, windows, doors, siding or stucco matched to the house as listed
·The bathroom built to stay dry: pan, waterproofing, tile, glass as listed
·Plumbing, water heater changes, power and cooling by the trade licensed for each, named in your scope
·The closet, drywall, paint, floors, trim and doors as listed
Named separately, never assumed
·Fixtures, the vanity, tile and glass above the written allowances.
·A bigger septic tank or a new drain field, priced as its own line after the County answers.
·Impact fees and utility fees, listed at cost when they apply.
·Hidden conditions in the ground or in the old house, priced only after they are visible, never guessed.
·Bringing the rest of the house up to flood code if the job crosses the 50 percent line. We tell you before, not after.

How long the yard is a job site.

Most master suites run 10 to 16 weeks of work once the City has approved the plans. That review comes first, and the City sets that clock, not us. The bathroom is why a suite runs longer than a room. The underground plumbing is inspected before the slab, and the tile has its own weeks. Your scope has the dates.

01
Walkthrough, lot answer, septic answer, flood check
02
Plans drawn, engineer stamps, filed with the City
03
Plans approved, site prepped, underground plumbing laid and inspected
04
Slab poured and inspected, walls up, roof tied in, dried in
05
Old wall opened, rough plumbing, power and cooling, inspected
06
Insulation and drywall, inspected; bathroom waterproofed
07
Tile, glass, fixtures, closet, floors, paint, trim
08
Final inspection and walkthrough together

When we tell you not to do it

A master suite is sold as the room you deserve. Often it is. Sometimes the plumbing or the lot makes it a bad idea, and nobody says so until the slab is poured. Here is where we say no, and why.

The septic tank cannot take another bedroom

On septic, a new bedroom can mean a bigger tank and a new drain field. The yard may not have room for the field. If the County says no, the suite is a room without a bedroom on paper, or it is not built. We ask before the drawing.

The drain has nowhere to go

If the sewer is high, far or on the wrong side, the drain needs a pump. A pump is a line, a noise and a thing that fails. We price it honestly. If it is the only way, we say so and let you decide with the number in hand.

The job would cross the 50 percent line

A suite on an older house in a flood zone can cost half the value of the house. Then the whole house has to meet flood code. A bedroom this year and the bath later is sometimes the answer. We run the number before the plans.

A bedroom and a bath inside the house would do

If a garage or a spare room can become the suite without new square feet, that is a smaller job. And a smaller price. We send you to garage conversions and in-law suites. We would rather do the right job once.

An empty room with a flooded floor reflecting the window, the case where an addition gets raised or not built

Lifetime warranty on our workmanship.

If the work we did fails, we come back and fix it. That holds for as long as you own the home. On a master suite it covers what we built and finished. The walls, the floor, the drywall, the tile we set, the doors, the trim and the paint prep.

What the warranty covers
·Walls we framed and finished staying plumb, tight and dry.
·Tile we set staying flat and bonded, with grout that does not crack along a line.
·The shower we built staying dry behind the wall and under the floor.
·Doors, windows and trim we set staying square, latching and tight.
What it does not cover, said here and not in a footnote
·The products themselves. Fixtures, the vanity, glass, the water heater and the mini-split carry their makers' warranties, and we hand you that paper.
·Work performed by the licensed trades. The slab, the structure, the roof tie-in and the systems carry their own warranty and are named in the scope.
·Water that comes in from outside, from a storm or a flood.
·Grout and caulk that need renewing over the years. That is upkeep, and we show you how.
·Anything we were not allowed to open or see on the walkthrough.

A warranty is only worth what its exclusions say. Ours are above, in the same size type as the promise. Ask whoever you are talking to how long theirs runs, and get the number in writing.

Questions we actually get asked

How big is a master suite?

Most run 300 to 500 square feet. A bedroom of 200 or more, a bathroom of 60 to 100, and a closet. The lot sets the outside line, and we draw to it. Bigger than that is a lot of square feet with no plumbing in them, and the number shows it.

Can it have its own door to the outside?

Yes, and many do. A door to the back yard or the pool is a line like a window. It does not make the suite a second dwelling unless it has a kitchen. A bedroom and a bath with its own door is still your house.

Do I need a permit for a master suite addition?

Yes. New square feet is a building permit with a plan review and inspections at each stage. The underground plumbing is inspected before the slab is poured. Plumbing, power and cooling get their own permits. They are pulled by the contractor licensed for each, named in your scope. The fees are listed as their own line, at cost.

Will the water heater keep up?

That is one of the first things we look at. A second full bath on one tank usually means a bigger tank, a second heater or a tankless unit. It is a line in the scope, with a number. The first cold shower is not how you find out.

Can I stay in the house during the work?

Yes, for almost all of it. The suite is built outside the house behind the old wall, and that wall opens near the end. Your existing bathroom works the whole time. The day the wall opens is loud, and the scope tells you which day.

What makes the price go up after signing?

Only a change you ask for, or a hidden condition we could not see. A change is priced in writing before it happens. A hidden condition is priced only after it is visible. Nothing else moves the number.

The other home addition services

An empty new room with large windows and a wood floor, the finished side of a home addition What a home addition costs in Tampa, FL The 3 questions that move any addition between ranges. A bright living room with wooden floors and large windows, the finished side of a room addition Room addition A new slab, a roof that ties in clean, and a room that reads as original. A sunroom with rocking chairs and glass doors opening to the house, the finished side of a sunroom addition Sunroom and Florida room The five kinds, the one you can sit in, and the glass rated for the wind.

All four home addition services

Where we work

Hillsborough, Pinellas, Pasco, Manatee and Sarasota counties. If your town is not on this list, call and ask: the answer is often yes.

Tampa Brandon Riverview Valrico Seffner Ruskin Apollo Beach Plant City Temple Terrace Lutz St. Petersburg Clearwater Largo Seminole Palm Harbor Safety Harbor Oldsmar St. Pete Beach Wesley Chapel New Port Richey

A walkthrough, then a written scope with one closed price.

Never hourly, never a verbal figure, and our workmanship carries a lifetime warranty. Hillsborough, Pinellas, Pasco, Manatee and Sarasota counties.

See a sample scope document
{{ sentMsg }}