A whole home remodel is not one big job. It is ten small ones in the right order, in the right rooms, with the right trades. The sequence is the product. Get it wrong and the painter paints a wall the electrician opens next week. Get it right and the house comes back one room at a time, finished.

An empty room in a house during renovation with new walls and a window, whole home remodel
Ten small jobs, one order. The painter should never meet the electrician in the same room.

In a whole home remodel the sequence is what you are buying.

Remodeling pages show finished rooms. None of them shows the calendar that got there. That calendar decides whether the job finishes on time, or at all. Here is what to ask before you hire anyone, including us.

A wide view of a sunny room under renovation, whole home remodel
01

Every trade has a place in line

Demolition, then the licensed trades behind the walls, then inspection. Then drywall, paint, doors and trim, floors, and baseboards last. Change the order and someone damages someone else's work. A bid without a sequence is a bid without a plan.

02

Inspections set the pace, not the crew

In Hillsborough, work behind the wall gets inspected before the wall closes. Plumbing, electrical and framing each have their own. The drywall cannot go up until the inspector signs. The schedule is built around those dates, not around how fast anyone can work.

03

One scope across every trade

When each trade has its own contract, the gaps between them are yours. Who patches the hole the plumber cut. Who paints the wall the electrician opened. One written scope names it all, and one company answers for it.

04

Milestones you can see

Payments tied to stages you can walk through. Rough work inspected. Walls closed. Rooms finished. You never pay ahead of what exists in the house. That is what keeps a remodel from stalling with your money in it.

Rooms and systems decide the price. Finishes decide the rest.

Two houses of the same size can price very differently. Here is what actually moves the number on a whole home remodel.

01

How many rooms are in the job

Each room is its own list of surfaces and trades. Three rooms is not three times one room, because setup and protection are shared. It is close. Count them before you call.

02

How many systems get touched

Every wall that moves, outlet that is added or sink that relocates brings in a licensed trade. With it come a permit and an inspection. A remodel that stays on surfaces is a fraction of one that opens systems. This is the biggest line.

03

Whether you are living in it

Phasing the work around a family means dust walls and a working kitchen at all times. Rooms get done in a certain order. It is slower and it costs more. It is also the only way most people can do it.

04

The finishes you choose

Doors, trim profiles, paint lines and floors range from builder grade to custom. The scope names each with an allowance. You can move up or down without the number moving on its own.

What gets settled before any trade starts.

A remodel across several rooms only works if the plan is written first. These are the things that get settled before the first wall opens.

Close up of a wall calendar with red push pins marking the work days, whole home remodel
01

Every room walked and photographed

We walk each room in the job and photograph it. We look in the attic over walls that change and under sinks near them. You get the photos with the scope. Nothing in the house is a surprise later.

02

Structure and systems identified

Any wall that might carry load is flagged for the licensed trade and an engineer before it is planned around. Any plumbing or wiring that moves is listed by trade. Each gets its permit named.

03

The sequence written, room by room

Which room first, and in each room which trade first. Which rooms stay usable while others are open. It goes in the scope with dates. It is the document that makes the schedule real.

04

Allowances set for every finish

Doors, trim, paint, floors. Each gets a written allowance. Pick above it and the difference is a change order, in writing, before it is ordered. Pick below it and the number comes down.

05

Dust walls and living zones planned

If you are staying, the house gets divided. Where the plastic goes, which bath stays working, where the crew enters. It is drawn before demolition, not improvised on day one.

What is included, and where it ends.

A written scope is only worth something if it says where it stops. These are the lines we put in writing before anything is ordered.

Included in the scope
·Every room in the job walked, photographed and listed
·Protection of floors, doorways and rooms not in the job
·Demolition and haul away
·The licensed trades named for plumbing, electrical and structure, with their permits
·Drywall hung and finished to the level named, room by room
·Paint, doors, trim and baseboards as listed
·The sequence with dates, and milestone payments tied to it
·Daily cleanup and a final walkthrough of every room together
Named separately, never assumed
·Fixtures, appliances and finishes above the written allowances.
·Flooring, unless the scope names it. It is often its own line.
·Kitchen cabinets and countertops, which have their own pages and their own scope.
·Hidden damage behind walls, priced only after it is visible, never guessed.
·Storage, furniture moving and temporary housing.

How long the house is a job site.

Weeks to months, set by the number of rooms, the inspections and whether you are living in it. Rooms come back one at a time in the order the scope names. Nothing is torn out until the trade that follows is scheduled. Your scope has the dates for every room.

01
Walkthrough, scope, sequence with dates
02
Permits filed by the trades that need them
03
Dust walls up, first rooms demolished
04
Rough work by the licensed trades, inspected
05
Drywall, finished to level
06
Paint, doors, trim
07
Floors and baseboards, room by room
08
Final walkthrough of every room together

When we tell you not to do it

A whole home remodel is the biggest job on this site. That makes it easy to sell to someone who should do something smaller. Here is where we say no, and why.

The plan changes every week

A remodel with no fixed scope never finishes. If the list is still moving, we help you settle it first. Then we price it. Ordering doors for a room whose layout is not decided is buying them twice.

The budget is for surfaces and the wish list is systems

If the number covers paint and trim, moving walls and plumbing is not in it. Do the surfaces well now. Plan the systems for later, with the money to do them once.

The house is going on the market

A whole home remodel does not return its cost at sale. Paint, patched walls, clean doors and new baseboards often do. We would rather point you at that list.

You want it done while you are away for 2 weeks

Inspections and lead times do not fit in 2 weeks for more than one room. A crew that promises it is skipping one of them. We schedule around the inspector and say so up front.

A doorway stripped to the framing during a demolition, the point where a remodel gets decided

Lifetime warranty on our workmanship.

If the work we did fails, we come back and fix it. That holds for as long as you own the home. On a whole home remodel it covers what we built and finished in every room. And the way we sequenced it.

What the warranty covers
·Drywall we hung and finished staying flat, with seams that do not show.
·Doors we hung staying square and latching.
·Trim and baseboards we set staying tight and caulked.
·Paint we applied on surfaces we prepped staying bonded.
What it does not cover, said here and not in a footnote
·The products themselves. Doors, fixtures and paint carry their makers' warranties, and we hand you that paper.
·Work performed by the licensed trades. It carries their own warranty and is named in the scope.
·Water damage after the job, from a leak or an appliance.
·Settling cracks in a house that is still moving.
·Anything we were not allowed to open or repair, and what it does later.

A warranty is only worth what its exclusions say. Ours are above, in the same size type as the promise. Ask whoever you are talking to how long theirs runs, and get the number in writing.

Questions we actually get asked

Do you do the whole house yourselves?

We do the walls, doors, trim, paint and the order of work. Plumbing, electrical and structure go to the trade licensed for each, named in your scope. They pull their own permits. One scope, one company answering for the whole thing. That is the model.

Can we live in the house during a whole home remodel?

Usually, yes. The house gets divided with dust walls. Rooms are done in an order that keeps a kitchen and a bath working. The scope says which rooms are open when. It takes longer than an empty house. The dates are in the scope.

How do payments work?

By milestones you can see. Signing, rough work inspected, walls closed and finished, final walkthrough. You never pay ahead of what exists in the house. The stages and the percentages are on our how we price page and in your scope.

What if we find something behind a wall?

It gets priced when it is visible, in writing, before anyone touches it. Old wiring, a leak, a wall that carries load. We do not guess at hidden damage in the original number, and we do not fix it without your yes.

Do I need permits for a whole home remodel?

For the parts behind the wall, yes. Plumbing, electrical, structure, and in Hillsborough new drywall. The licensed trade doing each part pulls its permit. Paint, doors and trim usually do not need one. The scope names each permit and who applies.

How long does it take?

Weeks to months. The inspections between trades and the lead times on doors and materials set the calendar more than the labor does. Rooms come back one at a time. The scope has a date for each room.

The other home remodeling services

A renovated room with gray walls, new lighting and clean trim, home remodel cost What a home remodel costs in Tampa Bay The 3 questions that move any home remodel between ranges. New drywall hung with taped and patched joints, drywall repair Drywall repair and installation Finished to the level the light demands. Texture matched first. A white interior door and staircase with painted trim, interior door replacement Interior doors, trim and baseboards The cheapest job that changes a house, and the easiest to order wrong.

All four home remodeling services

Where we work

Hillsborough, Pinellas, Pasco, Manatee and Sarasota counties. If your town is not on this list, call and ask: the answer is often yes.

Tampa Brandon Riverview Valrico Seffner Ruskin Apollo Beach Plant City Temple Terrace Lutz St. Petersburg Clearwater Largo Seminole Palm Harbor Safety Harbor Oldsmar St. Pete Beach Wesley Chapel New Port Richey

A walkthrough, then a written scope with one closed price.

Never hourly, never a verbal figure, and our workmanship carries a lifetime warranty. Hillsborough, Pinellas, Pasco, Manatee and Sarasota counties.

See a sample scope document
{{ sentMsg }}